Professional PCB manufacturing and assembly
Building 6, Zone 3, Yuekang Road,Bao'an District, Shenzhen, China
+86-13923401642Mon.-Sat.08:00-20:00
Industry news

Industry news

What are the requirements of SMT processing on PCB board
26Jun
Caddy 0 Comments

What are the requirements of SMT processing on PCB board

This is the SMT processing of PCB board requirements, in the production of PCB board is not slack, the production

How can PCB circuit boards distinguish good from bad from appearance?
26Jun
Caddy 0 Comments

How can PCB circuit boards distinguish good from bad from appearance?

With the rapid development of high-tech industries such as mobile phones, electronics, communications, and autonomous driving, the PCB circuit board industry has largely driven the continuous expansion and rapid growtothe circuit board industry, and peopl

How can SMT Assembly components be manually welded?
26Jun
Caddy 0 Comments

How can SMT Assembly components be manually welded?

SMT Assembly is a form of packaging semiconductor devices,SMT Assembly involves a variety of different styles of parts

PCBA processing tin beads can accept standards
26Jun
Caddy 0 Comments

PCBA processing tin beads can accept standards

Some industry standards explain tin beads. The categories range from no tin beads allowed in MIL-STD-2000 to less than five per square inch in IPC-A-610C.

PCB Lecture Hall: Common metal substrate classification and its advantages
25Jun
Caddy 0 Comments

PCB Lecture Hall: Common metal substrate classification and its advantages

At present, the PCB circuit board products on the market are mainly divided into three types from the material category: ordinary substrate, metal substrate and ceramic substrate.

How does PCB design prevent others from copying the board?
24Jun
Caddy 0 Comments

How does PCB design prevent others from copying the board?

In PCB design, after completing the PCB design​ through many levels, the most important thing is the copyright issue, and plagiarism is common.

PCB design technology is very complex
24Jun
Caddy 0 Comments

PCB design technology is very complex

professional PCB design for more than 20 years, next for everyone to share the eight common technical problems of PCB design.

How long is the PCBA processing quotation cycle?
24Jun
Caddy 0 Comments

How long is the PCBA processing quotation cycle?

The production time of SMT patches and DIP plug-ins is relatively short, but also depends on the difficulty of the process and the adequacy of factory orders. The normal lead time for proofing is about 1-3 days. Normal delivery time is about 5-7 days.

Do you know the requirements for PCBA processing
24Jun
Caddy 0 Comments

Do you know the requirements for PCBA processing

The company gives full play to its competitive advantages in scale procurement and quality control, and has signed long-term cooperation agreements with many electronic component manufacturers at home and abroad and around the world to ensure the quality

Do you know the various processes in PCBA processing?
24Jun
Caddy 0 Comments

Do you know the various processes in PCBA processing?

Long-term maintenance of IC, resistors, capacitors, inductors, audiodes and other components procurement advantages, can greatly save customers' inventory costs, improve production turnover efficiency, save time. Currently for the United States

Soldering requirements for PCB circuit boards in PCB assembly
24Jun
Caddy 0 Comments

Soldering requirements for PCB circuit boards in PCB assembly

PCBA welding processing, there are usually many requirements for the PCBA board, and the requirements must be met in order to weld.Then why does the welding process need so many requirements for the PCBA board?

How to improve the pass rate of SMT patch processing?
24Jun
Caddy 0 Comments

How to improve the pass rate of SMT patch processing?

SMT chip processing has an important indicator for processing quality evaluation, that is, the straight-through rate. In the patch processing. SMT process pass rate refers to the proportion of one-time qualification from production to the last process.

Just upload Gerber files, BOM files and design files, and the KINGFORD team will provide a complete quotation within 24h.