Professional PCB manufacturing and assembly
Building 6, Zone 3, Yuekang Road,Bao'an District, Shenzhen, China
+86-13923401642Mon.-Sat.08:00-20:00
TAG:

SMT

BGA repair method and precautions

In PCBA welding, problems often occur due to BGA welding or SMT chip welding

Reduce surface tension and viscosity in PCBA welding

How to reduce the surface tension and viscosity in PCBA welding, explained by the circuit board manufacturer

Quality and thickness of PCBA welding metal bonding layer

Pay attention to these details to easily avoid the quality and thickness problems of PCBA welding metal bonding layer

What is the difference between ICT and FCT in PCBA test?

People often do not know much about the PCBA test, and there are many questions. Next, I will make a deep analysis of the PCBA test to answer the questions in the minds of netizens.

Why does FCT replace ICT in PCBA test become a trend?

People often do not know much about the PCBA test, and there are many questions. Next, I will make a deep analysis of the PCBA test to answer the questions in the minds of netizens.

MSL in PCBA processing

Management Method of MSL Humidity Sensor in PCBA Process

Explanation of reliability test in PCBA processing?

Shenzhen PCB manufacturer explains reliability test in PCBA processing

Understand the SMT process of electronic circuit board production

Understand PCBs loaded, SMT technolog and PCB manufacturing in PCB related industries, and the SMT process of electronic circuit board production

Explanation of several major requirements for PCB processing and production

Explanation of several major requirements for PCB processing and production of circuit board manufacturers

PCBA assembly and welding process of FPC

PCBA assembly and welding process of FPC is different from that of hard circuit board

Dimensions of PCBA pads and design defects of chip components

What are the dimensions of PCBA pads and design defects of chip components

Methods of Preventing Welding Porosity in PCBA Factory

The welding porosity in PCBA factory is actually the bubble in the welding process of PCBA processing.

Just upload Gerber files, BOM files and design files, and the KINGFORD team will provide a complete quotation within 24h.